Breakthrough on tunnel under the Thames

Posted in: CMT Group Blog
Construction News Barhale has achieved breakthrough of a 330m long tunnel under the Thames from Chelsea to Battersea Park.  The tunnel will form part of the gas distribution under Cadent’s £1bn programme to replace the aging infrastructure across London. The tunnelling work, which took just over three weeks to complete, saw around 4,500m3 of material excavated.
Loading...
Comments
Leave your comment
CMT Equipment Ltd